First, to be clear: by post-construction cleaning we do not mean removing rubble or scraping concrete with a spatula. We mean the fine cleaning before the space is used, in a space that has been handed over by the contractor or architect and has already had its rough clean.
Questions on your mind as construction finishes
Questions you may have before moving in or opening your business:
- How many people come, and is the job finished the same day?
- Do I need to watch over the staff? Will they do a good job?
- How is the price set, and is a video enough?
- Do construction residues come off?
- Will marble, glass and other surfaces be damaged?
Short answer: We have been doing post-construction cleaning in Istanbul for years and we hand the job over to you properly finished. With a team of at least 2-3 people, the job is usually finished the same day. You pay near the end of the job, after inspecting the work and taking it over.
“I got in touch to have our new home cleaned after construction. They were very helpful and friendly people, and when I chatted with the ladies I learned that they had been working there for a long time. I recommend them to everyone.”Hilal Yetkin
Which day is right for the appointment?
Please make sure that:
- The tradespeople have finished their work.
- The electricity is connected and switched on.
- The water is connected and switched on.
- Touch-up work is complete.
- Appliances have been installed.
- Fine cleaning will be done
- The removal company will move you in
- There should be no work left to do on paint, final touch-ups or appliance installation.
- Rubble, paint tins and cardboard laid on the floor left by the tradespeople should be cleared away.
- If the parquet has just been varnished, wait at least 3 days for it to dry. (Otherwise even drops of water can leave marks.)
- Electricity and water must be on, as we need power for the steam and wet vacuum machines.
- Our team arrives at 09:00, and you get a call 20 minutes before they arrive.
- We recommend booking the removal and furniture assembly for the second day after the cleaning.
What does the team do in the apartment?
After the contractor's rough clean, paint and silicone on the glass, mortar in the grout lines and fine construction dust remain in the apartment.
Work starts with the frame channels and the windows and continues with the kitchen and bathroom. In each room our team wipes the high surfaces first and works downwards. The floor is done last, because the dust that falls while cupboards and radiators are wiped would dirty a floor that has already been cleaned.
- Frames, channels and radiators
- Protective film and labels left on window frames are removed, and the adhesive underneath is cleaned off.
- Dust packed into the corners of frame channels is loosened with steam and then vacuumed up.
- Mortar stuck to the marble window sills inside and out is scraped off, and the sills are wiped.
- The steam machine is also used inside the radiators, taking out the construction dust that has built up between the sections.
- Windows
- Paint, mortar and silicone on the glass are scraped off with a blade after the glass has been foamed.
- The glass is wetted with a strip washer and the water is taken off with a squeegee.
- The outer side of the glass is wiped from inside with a telescopic pole.
- Kitchen
- Fine dust that has settled inside and on top of the cupboards is removed, using a ladder for the top shelves.
- The top and underside of the worktop and the insides of the drawers are cleaned.
- Bathroom and toilet
- Mortar and grout residues on the tile grout lines are cleaned.
- Fine dust inside the bathroom cabinets is removed and the doors are wiped.
- The toilet, washbasin and shower cabin are wiped, and the taps and fittings are polished.
- Doors, sockets and walls
- Construction dust on door leaves, frames and handles is wiped off.
- Paint that splashed onto socket covers, switches and around lamps during painting is cleaned off.
- Fine dust on painted walls is taken off with a dry mop.
- Paint marks on the skirting boards are cleaned.
- Floors last
- Ceramic floors are cleaned by applying foam with a vacuum machine.
- Dry foam is applied to parquet floors and the fine dust is taken up with a wet vacuum machine.
- Laminate floors are washed and rinsed like ceramic floors.
- The balcony floor, railing and glass are cleaned.
Are surfaces damaged?
Limescale remover that dissolves the mortar in grout lines leaves a dull mark where it touches a marble surface or step. That is why our team checks the whole apartment before starting work.
| Surface | What do we watch out for? |
|---|---|
| Glass | Glass is never scraped dry. Because mortar contains sand, grains that break off on dry glass travel with the blade and leave fine scratches. On wet glass, the fine glass scraper blade should be held diagonally at 45 degrees. |
| Frames | The adhesive of film left in the sun for a long time bonds to the surface, and removing it then takes much longer. Dust in the frame channels is removed with the help of a steam machine. |
| Marble and granite | No limescale remover is used, we work with an acid-free product. |
| Grout residues on tiles | Tiles are washed with a suitable solution, then rinsed, and any missed spots are checked. The solution is diluted with water so that it does not wear away the grout. |
| Parquet | Dry foam is applied with a wet vacuum machine and the floor is then cleaned with the wet vacuum machine. Afterwards, a clean mop is passed over it. |
| Doors and furniture | The product is chosen according to the type of finish, and these surfaces are never wiped with the product used on glass or grout. |
| Dust on walls | A dry mop is passed over them. |
Does every mark come off?
Cleaning removes residue that sits on top of a surface. A mark formed in the surface itself during construction cannot be removed by cleaning.
| The mark you see | With cleaning | Explanation |
|---|---|---|
| Fine construction dustcupboards, sockets, glass and frames | Comes off | The insides of cupboards are wiped, and dust in channels and radiators is extracted with a machine. |
| Paint, mortar, silicone on glass and tiles | Comes off | Because the residue sits on top of the surface, it is scraped off. |
| Mortar and grout residue in grout lines | Comes off | Cleaned with wire wool and a sponge without damaging the grout. |
| Paint worked into PVC window joints | Does not always come off | Seen on porous, wood-effect brown and anthracite window frames. |
| Paint and plaster stainssolid wood parquet, lacquered cupboards, black walls | Hard to remove | Because of the treatment these delicate surfaces need, we recommend warning the decorators before any painting starts. |
| Marble dulled by the wrong product | Does not come off | Because the surface itself has changed, cleaning cannot restore it. |
How many people come, and how long does the job take?
Post-construction cleaning in spaces other than apartments
Post-construction cleaning is basically the same in every space, but what changes from one space to another is the surfaces that need care, the size of the team and how the work is organised. In villas, hotels, factories and projects with several apartments, the number of teams is increased or the work is spread over several days.
Post-construction villa cleaning

Sliding doors and staircases. The long channels of sliding doors are cleaned with a steam machine and a vacuum, and stair treads and railings are wiped. Construction dust that has settled in the basement, attic and plant rooms is also removed.
Move-in cleaning is described on our villa cleaning page.
Post-construction cleaning of building common areas

Stairs, railings and the lift car. Because materials and tradespeople pass through the common areas throughout construction, dust and mortar marks build up on the stairs and in the entrance hall. Cleaning starts on the top floor and works down to the entrance hall.
For regular common area cleaning in buildings and residential complexes, see our facility cleaning page.
Post-construction office cleaning

Suspended ceilings and plasterboard dust. The fine dust from fitting ceilings and cutting plasterboard settles inside cable trunking and on glass partition profiles, and spreads over desk surfaces.
Regular cleaning after the office has moved in is described on our office cleaning page.
Post-construction shop cleaning

Shop window glass, fitting room mirrors and shelves. Label marks and overflowing silicone left from the fit-out sit in the places that catch the eye first when the door opens. The cleaning can be planned outside working hours or at the weekend to suit your opening time.
For shop glass and shop windows, see our facade and glass cleaning page.
Post-construction cleaning for businesses

Counter and worktop finishes. In a café, showroom or beauty salon, the material covering the counter and worktop changes with every fit-out. Once wood, lacquered or stainless steel surfaces have been seen in the video, a suitable product and working method is chosen for each.
Post-construction hotel cleaning

Room bathrooms, lobby and reception desk. The rooms are done floor by floor, and a separate plan is made for the lobby, restaurant and corridors.
For room and common area cleaning once the hotel has opened, see our hotel cleaning page.
Post-construction hospital cleaning

Vents and wall guards. In wide corridors, fine dust builds up on ceiling vent grilles, above doors and on the top edge of wall guards. The order in which departments are cleaned is agreed with you at the start.
For periodic cleaning tailored to institutions, see our facility cleaning page.
Post-construction clinic cleaning

Examination rooms. When the worktop, cupboards and the area around the sink are cleaned before the equipment is moved in, the spots that will end up under the equipment are cleaned too. The waiting room, reception and toilets are cleaned separately.
Post-construction factory and warehouse cleaning

Epoxy and concrete floors. Before the machines are put in place the whole floor can be reached, so cement stains are easier to remove at this stage. Large floors are washed with a machine. The price and schedule are set after a free survey.
Regular cleaning after production starts is covered on our factory cleaning page.
“Before our shop opening they worked all night and handed the space over spotless in the morning.”Okan Yılmaz
Post-construction cleaning prices
Our prices depend on the scope of the work and the condition of the space. For apartments we go by the number of rooms, the floor area and how heavy the residue is, and a short video is enough for us to see these. The table below shows November 2026 prices.
| Apartment type | Price range |
|---|---|
| 1+1 apartment | ₺11.000 – ₺13.000 |
| 2+1 apartment | ₺11.500 – ₺14.500 |
| 3+1 apartment | ₺13.500 – ₺16.500 |
| 4+1 apartment | ₺16.000 – ₺20.000 |
| Duplex | ₺16.500 – ₺20.500 |
- For a 3+1 apartment over 100 m², 1.000–3.500 ₺ is added to the price depending on the floor area band.
- If the job needs a crew of 4 or 5, the price follows the crew size.
- 1.000–2.000 ₺ is added for a second and third bathroom or toilet, and 500 ₺ for an enclosed balcony.
- The ranges in the table are for apartments. For villas, offices, shops, hotels, factories, healthcare buildings and building common areas, the price is set after the job has been seen on video or during a free survey.
Show these in the video
So that we can send you a price right away, you can send a short video of the space and its approximate floor area on WhatsApp. Besides all the rooms, it helps if the video shows these details close up:
Paint on the glass
Take close-up shots of paint and silicone on the windows.
Grout lines
Show the mortar in the grout lines in the bathroom and kitchen.
Film and labels
Show any protective film not yet removed from frames and doors.
Large windows
Floor-to-ceiling windows and glazed balconies add to the glass area, so show them separately.
Number of bathrooms
Show all the bathrooms and toilets, as a second and third bathroom are added to the price.
Leftover waste
If sacks or rubble are still on site, show them as well.
How do handover and payment work?
Handover takes four steps, and payment is taken at the last step.
- 01Handover callYou get a phone call before the handover.
- 02Joint inspectionAll areas are checked together with you.
- 03Handover documentThe job handover document and the satisfaction form are filled in.
- 04PaymentTaken in cash or by bank transfer after the form is filled in.
Places we suggest you check at handover
During the handover walk-through you can check the places below together with the team. Most of them cannot be seen when you look straight ahead while standing.
Up high
- Tops of doors
- Tops of cupboards
- Architraves
- Around lamps and sockets
At the windows
- Window channels
- The glass, also from the side
- Marble window sills
- Film and label marks on the frames
In the kitchen and bathroom
- Inside drawers and cupboards
- Under the worktop
- Grout lines
- Fittings and shower cabin
Down low
- Skirting boards
- Room corners
- Inside the radiators
- Balcony floor and railing
Frequently asked questions
Do I need to stay in the apartment during the cleaning?
No. You only need to open the door when the team arrives at around 09.00 in the morning. We call you before the job is finished, and you need to come to the apartment in the late afternoon for the handover inspection.
Do you also take away the rubble and sacks left by the tradespeople?
We do not offer a rubble and rough waste removal service. We ask that sacks and large packaging are taken out of the building as the tradespeople finish their work.
Are the outside windows on high floors cleaned too?
Outside windows are wiped without leaning out, as far as a telescopic pole can reach, in line with occupational safety rules. For the outside of the building, see our facade cleaning page.
Do you also clean empty apartments after a tenant moves out?
Yes, we also clean apartments that become vacant after a tenant moves out. You can find how grease, limescale and dirt left by the previous tenant are removed on our empty apartment cleaning page.
Do you work at weekends or outside working hours?
For post-construction cleaning before a shop or office opens, work outside working hours and at weekends can be planned to suit the opening time. The team's start day and time are agreed with you in advance.
Which districts do you work in?
We serve the whole of Istanbul, on both the European and Anatolian sides. You can call 0212 369 19 69 for the European Side and 0216 329 90 75 for the Anatolian Side.